Chapter 8: The impact of surface-water demand for irrigation on water availability in Chongwe catchment
- Teddy Mwenya(author)
- Kamuti Mulonda(author)
- Joel Kabika(author)
- Edwin Nyirenda(author)
Export Metadata
| Title | Chapter 8: The impact of surface-water demand for irrigation on water availability in Chongwe catchment |
|---|---|
| DOI | https://doi.org/10.4102/aosis.2020.BK205.08 |
| Landing page | https://books.aosis.co.za/index.php/ob/catalog/book/205 |
| License | https://creativecommons.org/licenses/by-nc-sa/4.0/ |
| Copyright | Nnenesi A. Kgabi (ed.). Licensee: AOSIS (Pty) Ltd. The moral right of the authors has been asserted. |
| Publisher | AOSIS |
| Publication place | Durbanville, Cape Town, South Africa |
| Published on | 2020-01-01 |
| Long abstract | This study aimed to determine water demand for irrigation in the Chongwe catchment and its impact on water availability in the catchment. The water demand for irrigation was assessed by determining an irrigated area for the entire catchment from water users’ information, as well as relevant institutions, compiling crop factor values from literature, multiplying values of crop factors with ET to have crop requirements, computing runoff depth from rainfall; then monthly precipitation values were subtracted from the crop water requirements to obtain the water demand for irrigation. The correlation between water demand and water availability was also determined, as well as correlation between the irrigation areas and water availability to determine the impact of the two demands on water-resource availability. The study showed that the demand for irrigation has been increasing since 1963. Water demand for irrigation almost causes the flows of the Chongwe River at Chongwe Bridge to cease completely from mid-September to October every year. After October, the situation improves as some runoff is generated from rainfall. Nevertheless, the runoff generated in October is not adequate to sustain the river owing to the high demand for irrigation. Analysis of the impact of demand on water availability gave positive correlation values, except at Kapiriomba station which gave negative correlation values. That means water demand has been causing a decrease in long-term flows at Kapiriomba station, unlike other stations. The increase in flows at other stations may be attributed to the construction of hydraulic structures such as dams. |
| Print length | 23 pages |
| Language | English (Original) |
| THEMA |
|
| BIC |
|
| Keywords |
|
| Funding |
Contributors
Teddy Mwenya
(author)Teddy Mwenya is a final year student pursuing the Masters of Engineering in Water Resources Engineering, a program offered by the Department of Environment and Civil Engineering, at the University of Zambia, which is situated in Lusaka the capital city of Zambia, along Great East Road. He received a Bachelor of Science degree in Natural Resources Management from the same University in 2009. He has 10 years of post-graduate experience in the same field and is currently the Senior Inspector for WARMA, an Institution mandated to regulate, preserve, protect and conserve water resources in Zambia. He is interested in improving human lives through research works, enhanced management of water and other natural resources, value addition and the sustainable use of natural resources.
Kamuti Mulonda
(author)Kamuti Mulonda is a researcher and lecturer at the University of Zambia (UNZA) in the School of Engineering, Department of Agricultural Engineering, working with the soil and water conservation research group. His profound interest in hydrological modelling and water resources engineering began with his undergraduate final year project where he assessed the management of the UNZA turf irrigation system under the supervision of Mr Mate Maliselo. He proceeded to cover advanced aspects of hydrological modelling at the postgraduate level and published 1D/2D urban flood modelling for the city of Ghent in Belgium, under the supervision of Prof. Patrick Willems. Currently, Mulonda works with The Zambia-German Agricultural Knowledge and Training Centre (AKTC) at the Golden Valley Agriculture Research Trust in Chisamba under a Memorandum of Understanding between UNZA and AKTC, which study resulted into the current paper.
Joel Kabika
(author)Joel Kabika is a lecturer in Hydrology and Hydraulics in the Department of Civil and Environmental Engineering and also a coordinator of the Environmental Laboratory at the University of Zambia. He holds a PhD in Integrated Water Resources Management Groundwater in the Kalahari Sand aquifers of the Western Province at the University of Zambia and the Technical University of Denmark; a master’s in Integrated Water Resources Management, obtained from the University of Dar es Salaam (Tanzania); a Bachelor of Engineering degree in Agriculture Engineering, obtained from the University of Zambia; a Professional Diploma in Sanitation from the IHE-Delft, The Netherlands; and a certificate in Ecosan from the IHE-Delft, The Netherlands. Kabika has taught and carried out consultancy services in Water Resources Management, including ecological sanitation, water quality, treatment transport and distribution, and environmental impact assessments. He has carried out consultancy in establishing a multi-stakeholder’s platform to facilitate dialogue amongst stakeholders in the Chalimbana River Catchment Zambia Water Partnership, in conjunction with Ms Malama Mukonge in July 2006. Kabika has done a rapid environmental assessment for the Chongwe and Luangwa District and trained 60 Chiefs and Headmen in Integrated Resources Management in the Chongwe and Luangwa Districts in conjunction with Water and Sanitation Association of Zambia. Kabika is a member of the Engineering Institution of Zambia and a registered Engineer with the Engineers Registration Board.
Edwin Nyirenda
(author)Edwin Nyirenda is a Civil Engineer, specialising in the areas of Water Resources Management, Hydraulics and Hydrology. He also has vast field experience in the area of Water Supply, having worked for the Lusaka Water and Sewerage Company for 7 years from 1993 to December 1999, where he served as Manager of Technical Services and later on as Project Manager for the African Development-funded Lusaka Water Supply Rehabilitation Project. He has been the Chairperson of the National Task force on Non-Revenue Water, which has been appointed by the Government of the Republic of Zambia to advise the government on activities to reduce the national magnitudes of non-revenue water in water utilities. From 2000 to date, he has worked closely with the now Ministry of Water Development, Sanitation and Environmental Protection where he has developed water-resource management tools, including the Water Rights and Water Usage database for Zambia and surface-water resource modelling tools to assist in water resources management and allocations. He has also developed a web-based system to monitor the performance of water utility companies in terms of non-revenue water and other performance indicators directly from the input of information derived from the billing databases and the GIS systems. From September to November 2003, he participated in the hydraulic evaluations of the canals and hydrologic analysis of the Mulungushi and Lunsemfwa hydropower schemes to analyse the adequacy of the systems for the proposed upscaling of the power generation. Dr Nyirenda has taken several courses in the fields of water-resources modelling and management, as well as project management, amongst many others.
